DAY 222: OCTOBER 31, 2009

Dear Lara,
Hoping that everyone is fine, I and my family we're fine.

Find the attached files with pictures report.
# 35 A Man, among the cheku local community taking water home for various uses.

# 36, 37 and # 45 women and children of cheku village waiting for the water services during the pumping water test.

# 39, # 42 and # 43 women carrying water home for various uses.
#40 Young boys helping with bicycle to bring water homes.

Regards,
Moshi









Thursday, October 29, 2009

DAY 221: OCTOBER 29th, 2009

Hi.
Find more picture report....

# 22, 23, 24 Cheku women, some with very young babies on their back and kids at project site witnesses pumping water test, meanwhile waiting for the water to take home for home uses.

# 25 Cheku women on the way to the water project site, kids walked together with their Mom, no doubt just to help them.

# 26 Water realized into the water bucket, measurement taken here 20 liters per 13 seconds.

# 27 A full water bucket being moved for another water bucket to take place.

# 28 Geologist noting DATA down given by a driller during the pumping water test.

# 30 Women seems very close to a driller during the pumping water test, their aims to learn something during the exercise.

# 31 Cheku local community receiving water services during the pumping water test.

# 32 A woman transferring water another water bucket ready to take home for various uses at home.

More pictures to be sent.................

Regards,

Moshi.










DAY 221: OCTOBER 29th, 2009

Hi Lara,

Please, find more pictures attached.

# 15 and # 16 water come straight from water pipes at the pumping water test, the water realized into the mud pit no doubt can be uses late by cheku local community, especial for the cattle's.

# 17 Head Teacher for Cheku primary school drinking water during the pumping water test.

# 18 and # 19 Cheku kids were not behind, they came to witnesses the scene.

# 20 and # 21 cheku women in preparation with their water bucket waiting for their tools to be filled water for the home uses. Kids also their close with their parents during the pumping water test.

More to be sent..........

Cheers.

Moshi.










DAY 221: OCTOBER 29th, 2009

Dear Queen Victoria.

Greetings, no doubt that all are fine, I am fine too.
Find the attached files with pictures report for the Cheku water project.

# 4, the electronic tape at site before pumping test start, the tool used to identify water level and water drown down.

# 6, Cheku local community working hands with hands with Geologist-Mr. Josse and a driller-Mr. Beda, insetting the water pump into the WELL before the pumping test take place.

# 7, a tall Man,Mr.Moshi with Cheku local community working at project site before the pumping test start, here dropping the water pipes into the WELL.

# 8, even Cheku children came to witnesses the pumping water test but they helped their parents.

# 9, Cheku local community lifted up the water pipes in order to realise into the WELL before the pumping test start.

# 10, Geologist written DATA down, close before the pumping water test began.

# 11, Mr. Beda- a driller and Geologist-Mr. Josse dropping electronic tape into the WELL early before the pumping water test start.

Note, one of the picture sent wrongly difference with details, sorry for that.

More pictures to be sent,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,

Regards,
Moshi.







DAY 221: OCTOBER 29th, 2009

Dear Queen Victoria.

Hoping that all are fine, I am very fine too, also I found my family ok.

Find the attached pictures for the Cheku Water project.

1. The well capped and protected by acacia thorns before cement dry in order to avoid the damage from domestic animals. The blue pipe is ceasing water pipe.

2. The mud pit, during the drilling used to restore the mud used to drill the well.

3. Down it's water pump, the pump used during the water pumping test.

4. Cheku local community and children working in before the water pumping test start.

5. Old man- Gufu own of the land where the WELL drilled, cleaning the mud pit where the water will be store during the water pumping test, final the water used by cattle's.

Regards,
Moshi.








Monday, October 26, 2009

DAY 215: OCTOBER 24th, 2009

Hi

Hoping all are fine, I am fine too.

Find down an detailed email with water pumping water test as I promised to do it. I am at the water project site, many women, children and babies carried by their mothers are in here to either witnesses the water pumping water test or collecting the water.


CHEKU WATER PROJECT – WATER PUMPING TEST REPORTS.

On 21st October, at 10: am arrived at Cheku water project site by hired motor cycle. Geologist from Hydro tech and driller was setting the pump and electrical water tape just ready for the water pumping test.


At 10:45a.m the water pipes carried by Cheku local community through instruction from water technician taken into the well, the exercise performed accordingly water technician and a driller started on the generator. The problem happened with generator, by this day from the starting hours till late evening the problem persisting, final the water pumping test didn’t happen.

My self, I helped water technician and borrow a same kind of generator in the neighbor village at Kelema, most of the people had generator but all seemed too small to operate the water pump.

On 22nd October’0 9. At 08: 38a.m back to the project site, an electricity technician from Kelema village worked hardly to fix the problem with generator, at 11:49a.m the problem with generator fixed by electricity technician. The plug was not worked, so we borrowed another plug to produce power with generator.


The pump carried again by local community and taken into the well. The generator switched on and worked properly.


Another problem occurred with water pump!! The water pump failed to pumping water out from the well, power switched on at several times, final water technician detected the water pump didn’t work, the problem was from the motor of the water pump.

We had discussion, and water technician called their office in Dar, promised to sent new water pump from by next day on 23rd Octber’09. In case the new water pump will sent by the promise day we agree to work the next day on 24th Octber’09.

My comments, the generator seemed to be old and not the good one, as well the water pump was the same, look tired as it worked either they didn’t try all the equipments before brought at the water project site. Electronic water tape worked well and the tool is a new one and better, most of the time was giving sound results when dropped into the well and touched water level.

The breaking information- The new water pump arrival yesterday, right now I am at the project site, the pump worked and water pumped out just 13 second per 22 liters water bucket. The generator failed again to work, so the exercise stopped, we are waiting for the electrician to fix the problem.

Moshi R. Changai

PROJECT MANAGER

CHEKU WATER PROJECT

(In Country Representatives)

Tuesday, October 13, 2009

REPORT FROM HYDROTECH












OCTOBER 6th, 2009

Hello

Thanks for everything, I hope that all of you fine, I am very fine too.

Find the attached file above contain pictures report of Cheku water project.

Lara, I know that you understand very well our environment and Africa life, we are facing electricity power location, so we are given electricity mid of the night and early in the morning no power, so my work turned to be very very hard. Please sorry for the inconvenience, I don't like to give you also the hard time but no way out, Lara believe I work very hard and I like the work. I am in final preparation for technical report I will send it soon.

Much loves.......and warmly regards to Zoe.
Moshi.